VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120DO Observer: Chatterjee, S. Project type: VLBA Obs filename: bc120docrd.* Date/Day: 2004MAR25/085 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Cyrus M Reed. VCLOCK and GPS DELTA OK. UT1-UTC OK (-0.43). WEA: Cloud cover via webcam: WEA: SC clear skies. HN,NL,PT,BR Overcast. WEA: FD Cloudy. (10%) LA,KP,OV Light haze. WEA: MK Low clouds/fog. WEA: Rain at MK - other sites dry. 1828 Begin observing. All antennas on source. 1828 %SC: Autoallocate has forgotten what tape VSN is mounted on Drive 2. Last known VSN is CMVA0049 - will confirm with site tech. 1906-1907 *OV dropped out of point due to power failure. COM 100 1 Repointed. 1947 %LA Wind gusts > 35MPH. No readback checks this project. %SC: Tape VSN on Drive 2 is CMVA0049. 2028 End. Downtime Summary: Total downtime : 1 min Percentage downtime of observing: 0.1% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 1200 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.