VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120GO Observer: S. Chatterjee Project type: VLBA Obs filename: bc120gocrd.* Date/Day: 2004DEC09/344 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operators are Jim Ogle and Sonja Mendoza. %NL and OV did not correctly reposition tapes to the start of a new pass (previous project was done at a different data rate.) Don't know if this will affect it's ability to write data for this project since both sites will start in the middle of tape instead of with a fresh pass. PT writing on Mk5 disc NRAO-058. VCLOCK and gps delta checks okay. %High wind gusts at MK; may be some snow in dish. 0129 Begin. 0129-0130 %OV only had a few hundred feet to reach the end of a pass so if there are any problems it won't affect much data. Affected pass was pass #6, tape VLBA0356 on drive #2. 0129-0149 %NL had almost an entire pass to go so if there are problems it will affect most of pass #3, tape SVLB0004, drive #2. 0330 End. Downtime Summary: Total downtime : 0 min Percentage downtime of observing: 0.0% Average downtime per hour : 0.0 min Total scheduled observing time (# Antennas): 1210 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.