VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120CQ Observer: S. Chatterjee Project type: VLBA Obs filename: bc120cqcrd.* Date/Day: 2003DEC05/339 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Paul Dyer. VCLOCK, GPS Delta, and UT1-UTC check ok. 0617 Begin at all sites. 0617 *BR Snow in the dish. 0619 *BR WEA: Snowing. 0625 New operator: T. Perreault 0730-0810 *MK high system temperatures on channels 7 & 8 INT 25 10 (1683.99 MHz) - suspect RFI. 0818 End. Downtime Summary: Total downtime : 10 min Percentage downtime of observing: 0.8% Average downtime per hour : 0.5 min Total scheduled observing time (# Antennas): 1210 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.