VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120CS Observer: Chatterjee, S. Project type: VLBA Obs filename: bc120cscrd.* Date/Day: 2003DEC12/346 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 0620 Begin file VCLOCK check ok. SC at -0.168 UT1-UTC check ok GPS delta < 10 us Operator: T. Perreault 0620-0820 %SC air temperature and dewpoint are incorrect 12992 Estimated value of refraction model will be off. 0628 LA,PT Precipitation starting(snow). 0630 New operator: D. Pierce. 0653 %KP Precipitation starting. 0700-0701 *FD AZ brake fault. ACU 100 1 0708 %MK WEA: Wind gusting in excess of 35 mph. 0753 %BR WEA: Precipitation starting. 0816 %HN WEA: Wind gusting in excess of 35 mph. 0820 End. Downtime Summary: Total downtime : 1 min Percentage downtime of observing: 0.1% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 1200 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.