VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120FH Observer: Chatterjee, S. Project type: VLBA Obs filename: bc120fhcrd.* Date/Day: 2004MAY15/136 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 2234 Begin file VCLOCK check ok. MK at -0.520 (ping 1.308 seconds) UT1-UTC check ok. GPS delta < 10 us Operator: T. Perreault 2234-0035 %PT due to Servo work on antenna during Tiger team visit, the pointing is off. Expect to see weak fringes when correlated. 2234-0035 *PT TSMPLOTs show periods of flagging due to ACU 22 26 ELEVATION oscillations of up to 1 degree 30 minutes of arc at various ELEVATION positions. Time periods affected are as follows (from flagged data plot): (times in UT): 15 May from 2235 to 2238, 2240 to 2242, 2243 to 2245, 2253 to 2256, 2259 to 2301, 2302 to 2305, 2315 to 2317, 2321 to 2323, 2334 to 2335, 2351 to 2352; 16 May from 0016 to 0017, 0021 to 0023. Downtime is estimated. 2247-2253 *PT autostowed. Power glitch. Repointed. COM 100 6 2258 HN wea: raining 0000 Date is 2004MAY16/137. 0035 End. Downtime Summary: Total downtime : 32 min Percentage downtime of observing: 2.6% Average downtime per hour : 1.6 min Total scheduled observing time (# Antennas): 1210 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.