VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120EU Observer: Chatterjee, S. Project type: VLBA Obs filename: bc120eucrd.* Date/Day: 2004JUN13/165 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 0644 Begin file VCLOCK check ok. SC at -0.118 UT1-UTC check ok (-0.47) GPS delta < 10 us Operator: T. Perreault 0644-0845 *FD not observing due to scheduled maintenance SCH 100 121 0644-0740 %HN TSMPLOTs show high system temperatures INT 25 14 on channels 7 & 8 (1683.99 MHz / RCP/LCP). Suspect RFI. 0644-0845 TSMPLOTs show varying system temperatures on channels 7 & 8 (1683.99 MHz / RCP/LCP) for all sites to some degree. Only at HN does it look like an RFI "spike". 0845 End. Downtime Summary: Total downtime : 135 min Percentage downtime of observing: 11.2% Average downtime per hour : 6.7 min Total scheduled observing time (# Antennas): 1210 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.