VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120DX Observer: Chatterjee, S. Project type: VLBA Obs filename: bc120dxcrd.* Date/Day: 2004APR09/100 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Cyrus M Reed. VCLOCK and GPS DELTA OK. UT1-UTC OK (-0.45). WEA: Cloud cover via webcam: WEA: SC,HN Cloudy (30%,10%). WEA: Night at all other sites. WEA: No recent precipitation at any site. 1130 Begin observing. Antennas on source. 1130-1331 *PT not observing due to loss of all communication COMM 100 121 with site. NOTE: Tape may still be running at site since the observing files were sent out before the communications failure. Any data recorded to tape should be disregarded as antenna is not pointed. 1140-1220 %MK TSMPLOTs show elevated system temperatures INT 25 10 on channels 7,8. Suspect RFI. 1150-1210 *FD TSMPLOTs show high system temperatures INT 50 10 on channels 1,3,5,7. Suspect RFI. 1150-1210 *KP TSMPLOTs show high system temperatures INT 50 10 on channels 1,3,5,7. Suspect RFI. 1225-1235 *SC TSMPLOTs show high system temperatures INT 13 1 on channel 3. Suspect RFI. 1225-1235 *FD TSMPLOTs show high system temperatures INT 50 5 on channels 1,3,5,7. Suspect RFI. 1225-1235 *KP TSMPLOTs show high system temperatures INT 50 5 on channels 1,3,5,7. Suspect RFI. 1255-1305 *FD TSMPLOTs show high system temperatures INT 50 5 on channels 1,3,5,7. Suspect RFI. 1312-1314 *OV dropped out of point due to power failure. COM 100 2 Repointed. 1331 End. Downtime Summary: Total downtime : 169 min Percentage downtime of observing: 14.0% Average downtime per hour : 8.4 min Total scheduled observing time (# Antennas): 1210 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.