VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120EC Observer: Chatterjee, S. Project type: VLBA Obs filename: bc120eccrd.* Date/Day: 2004APR21/112 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 1142 Begin file VCLOCK check ok. SC at -0.134 UT1-UTC check ok. GPS delta < 10 us Operator: T. Perreault 1142-1343 %MK RFI, BBC channels 7 and 8. 1148 SC wea: low overcast, no precipitation 1153 HN wea: broken low clouds, no precipitation 1231-1234 *PT autostowed. Power glitch. Repointed. COM 100 3 1343 End. Downtime Summary: Total downtime : 3 min Percentage downtime of observing: 0.2% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 1210 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.