VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120DG Observer: Chatterjee, S. Project type: VLBA Obs filename: bc120dgcrd.* Date/Day: 2004JAN22/022 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 1836 Start. Op. D. Medcalf. vclock check and GPS delta okay. %Raining at KP. Extensive snow coverage of dish. Fog. 1850-1910 *MK TSMPLOTs show high system temperature "spike" on INT 25 5 channels 7 & 8 at this time. Freq. 1683.99 MHz LCP (CH07) and RCP (CH08). Suspect RFI. 1930 New operator: T. Perreault 1940-2000 *SC TSMPLOTs show high system temperature "spike" on INT 25 5 channels 7 & 8 at this time. Freq. 1683.99 MHz LCP (CH07) and RCP (CH08). Suspect RFI. 2015-2019 *KP autostowed. Power glitch. Site tech COM 100 4 repointed. There was an EL#2 armature overcurrent error condition; cleared by momentarily disabling the EL axis. 2037 End. Downtime Summary: Total downtime : 14 min Percentage downtime of observing: 1.2% Average downtime per hour : 0.7 min Total scheduled observing time (# Antennas): 1210 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.