VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120CN Observer: Chatterjee, S. Project type: VLBA Obs filename: bc120cncrd.* Date/Day: 2003DEC01/335 Ants Used: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is D. Pierce. VCLOCK and GPS Delta check okay. UT1-UTC: -0.38 2230 File begins. %BR WEA: Snowing, approx. 1/2 in. so far. %MK WEA: Thick cloud bank has rolled in. 2239 New operator is Paul Dyer. 2315 *MK WEA: Raining. 2320 *KP RFI seen in channels 7 and 8. 0000 Date is 2003DEC02/336. 0030 End. Downtime Summary: Total downtime : 0 min Percentage downtime of observing: 0.0% Average downtime per hour : 0.0 min Total scheduled observing time (# Antennas): 1200 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.