VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120DZ Observer: Chatterjee, S. Project type: VLBA Obs filename: bc120dzcrd.* Date/Day: 2004MAY25/146 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Cyrus M Reed. VCLOCK and GPS DELTA OK. UT1-UTC OK (-0.47). WEA: Cloud cover via webcam: WEA: SC Clear skies. HN,NL Stratus (100%,100%). WEA: FD Altocumulus (50%). WEA: LA,PT,KP Stratocumulus (100%,100%,100%). WEA: OV,BR Clear skies. MK Unknown (night). WEA: No recent precipitation at any site. 1258 Begin observing. All antennas on source. 1258-1315 *MK Taking known RFI, ch. 7 and 8. INT 25 4 1316-1318 *SC Autostowed due to power outage. Repointed. COM 100 2 1335 New Operator is Dave Pierce. 1417 %HN WEA: Overcast/wet. 1458 End. Downtime Summary: Total downtime : 6 min Percentage downtime of observing: 0.5% Average downtime per hour : 0.3 min Total scheduled observing time (# Antennas): 1200 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.