VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120BY Observer: Chatterjee, S. Project type: VLBA Obs filename: bc120bycrd.* Date/Day: 2003OCT08/281 Ants Used: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 2333 Begin file VCLOCK check ok. SC at -0.151 UT1-UTC check ok GPS delta < 10 us Operator: T. Perreault 2333-0134 *MK TSMPLOTs show high system temperatures INT 25 30 for channels 7 & 8. Suspect RFI. 0000 Date is 2003OCT09/282. 0025 *SC TSMPLOT shows a high spike in the system INT temperatures around this time for channels 1,3,5,7 0125 *SC TSMPLOT shows a high spike in the system INT temperatures around this time for channels 1,3,5,7 0035-0039 *KP autostowed. Power glitch. Repointed. COM 100 4 0134 End. Downtime Summary: Total downtime : 34 min Percentage downtime of observing: 2.8% Average downtime per hour : 1.7 min Total scheduled observing time (# Antennas): 1210 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.