VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC120DY Observer: Chatterjee, S. Project type: VLBA Obs filename: bj120dycrd.* Date/Day: 2004APR22/113 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 1039 Begin file VCLOCK check ok. SC at -0.150 UT1-UTC check ok GPS delta < 10 us Operator: T. Perreault 1100-1120 %FD TSMPLOTs show system temperature "spike" INT 13 2 on channel 5 (1593.99 MHz, RCP). Suspect RFI. 1103-1104 *KP EL#2 armature overcurrent error message 13846 100 1 cleared by momentarily disabling EL axis 1121 SC wea: low overcast, no precipitation 1124-1240 *MK unclearable AZ#1 armature/electronic circuit 13870 100 76 breaker fault condition. Site tech would not be able to make it to the site before the end of this file, and probably not until mid-way through the next file (BC120EG). Will call and consult with the oncall site tech. 1132 MK site tech said that it is unsafe to work on this problem at night. He will be up there about 1600 UT to work on the problem (this is 0600 HST). Removing antenna from the next two runs and stowing it. 1205 HN wea: low overcast, no precipitation 1240 End. Downtime Summary: Total downtime : 79 min Percentage downtime of observing: 6.5% Average downtime per hour : 3.9 min Total scheduled observing time (# Antennas): 1210 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.